The Project
Floor Plans
Square Footage Comparison
Rooms | Now | After | Rooms |
---|---|---|---|
Ground Level | Non-Permitted | 2,000 sq. feet Permitted, Finished | |
Multi-Purposes Hall | No | Yes -
1,462 sq. feet | |
Pantry | No | Yes | |
Morning Breakfast/Annual Feast | Yes - Non-Permitted, Unfinished | Yes -
1,462 sq. feet | |
Ping Pong Space | Yes - Non-Permitted, Unfinished | Yes -
1,462 sq. feet | |
Storage Space | No | Yes - 318 sq. feet | |
Children Ministries | Total 5 rooms ( 6 with partition)
equal 1,982 sq feet | Total 7 rooms equal
1,905 sq feet | |
Nursery Room | 351 sq. feet on 1st floor | No | |
G-01 (Current 105B) - Nursery | 250 sq. feet | 175 sq. feet | |
G-02 (Current 105A) - Toddlers or Nursery Extension (Suggested) | 282 sq. feet | 282 sq feet | |
G-03 (Current 104) - Inter-changable for grades | 407 sq. feet | 420 sq. feet | |
G-04 (Current 103) - Inter-changable for grades | 326 sq. feet | 360 sq. feet | |
G-05 (Current 102) - Inter-changable for grades | 366 sq. feet | 225 sq. feet | |
G-06 - Inter-changable for grades | No | Yes - 181 sq. feet | |
G-07 - Inter-changable for grades | No | Yes - 187 sq. feet | |
Child-Friendly & ADA Restroom | No | Yes - 75 sq. feet | |
First Level | |||
Lobby | 260 sq. feet | 981 sq. feet (with Reception Work Station) | |
Meeting Room | No | 118 sq. feet | |
No. of Pastoral Offices and Cubicles | 6 | 10 | |
Senior Pastor Office | 238 sq. feet | 129 sq. feet | |
Associate Pastor Office | Sizes Varies at Different Locales | In the Main Building - 59 sq. feet | |
Youth Pastor Office | At Mac Building | In the Main Building - 40 sq. feet | |
Finance Office | 6'x6' Cubicle | 40 sq. feet | |
Administrative Cubicles | 6'x6' Cubicle | 6'x6' Cubicle | |
Social Hall - Chapel | 1,961 sq. feet | 1,754 sq. feet | |
Storage Room | 174 sq. feet | 381 sq. feet | |
Cry Room | No (Current Rev. Chan Office) | Yes |
Interior Renderings
Ground Floor (Current Garage Floor)
First Floor
Second Sanctuary Floor & Mezzanine Level
Structural Modifications
For Full Descriptions, please click here.
One Major Structural Modification
-
Garage Level: Removal of an existing 30-ft long concrete masonry wall at basement and replace it with new steel frames
Design Criteria
-
Safety is the No. 1 priority
-
Comply and exceed all California Building Code requirements
-
Value Engineering includes cost-effective design, easy to construct and functional
Removal of an Existing 30-ft long concrete wall
Design Strategies
-
Shoring – Erect two new steel frames and transfer all loads from concrete wall.
-
Concrete Wall Removal – sawcut from bottom up; however, leave top portion intact.
-
Steel frames - Design to take 18% of total seismic load, with X-bracing for stability
Replace 30-ft concrete wall with Two Steel Frames
AV/Technology Updates
For SFCAC continue forward: INTERNET
-
Our building will have better WiFi coverage for staff, members and guest
-
Room will be updated with latest technologies for us to share message with our children and members
-
Equipment on each room will be equipped base on their functions and size
-
Provide future proof structure for expansion as needed
-
Reduce cost on existing technology like phone lines and long distance calls